Moller-doc-# | Title | Author(s) | Topic(s) | Last Updated |
---|---|---|---|---|
998-v3 | MOLLER Technical Design Report - Final | David Armstrong et al. | Project |
15 Feb 2024 |
1133-v1 | Main detector LV cabling and power supply needs Update | Michael Gericke | Detector |
01 Jun 2023 |
1105-v2 | Main Detector Overview and Status | Michael Gericke | Detector |
06 May 2023 |
1106-v1 | HVMAPS Overview/Plans | Michael Gericke | Kine Detector Backgrounds |
06 May 2023 |
951-v1 | Integrating Detector Overview and Update | Michael Gericke | Detector |
22 Jun 2022 |
947-v1 | HVPMAS Compton E-Det Update | Michael Gericke | Detector |
22 Jun 2022 |
561-v1 | Stability and Excess Noise in the Integrating Detector Signal | Michael Gericke | Detector Elec |
14 Feb 2020 |
Number of documents found: 7
DocDB Version 8.8.12, contact
MOLLER Collaboration
Execution time: 0 wallclock secs ( 0.19 usr + 0.01 sys = 0.20 CPU)