Moller-doc-# | Title | Author(s) | Topic(s) | Last Updated |
---|---|---|---|---|
1211-v2 | MAINZ test beam: September 2023 | Sayak Chatterjee | Detector Beam |
18 Apr 2024 |
1133-v1 | Main detector LV cabling and power supply needs Update | Michael Gericke | Detector |
01 Jun 2023 |
1111-v1 | Main detetor cooling and air flushing | Laheji Mohammad | Detector |
06 May 2023 |
1107-v1 | Compton e-Detector HVMAPS | Nafis Niloy | Beam Detector |
06 May 2023 |
1105-v2 | Main Detector Overview and Status | Michael Gericke | Detector |
06 May 2023 |
1106-v1 | HVMAPS Overview/Plans | Michael Gericke | Kine Detector Backgrounds |
06 May 2023 |
952-v1 | Integrating Detector Electronics Update | Jie Pan | Detector Elec |
22 Jun 2022 |
947-v1 | HVPMAS Compton E-Det Update | Michael Gericke | Detector |
22 Jun 2022 |
DocDB Version 8.8.12, contact
MOLLER Collaboration
Execution time: 0 wallclock secs ( 0.17 usr + 0.02 sys = 0.19 CPU)