Moller-doc-# |
Title |
Author(s) |
Topic(s) |
Last Updated |
---|---|---|---|---|
1125-v1 | Collimator 6A/6B Engineering Drawing. | Prakash Gautam et al. | Misc. ComponentDefinition |
23 May 2023 |
1060-v3 | Collimator 6A/6B redesign | Prakash Gautam | Beam ComponentDefinition |
05 May 2023 |
DocDB Version 8.8.12, contact
MOLLER Collaboration
Execution time: 1 wallclock secs ( 0.15 usr + 0.02 sys = 0.17 CPU)